We were called in to survey the north-west chimney of the Battersea Power Station which by 2021 will be hosting London new’s skyline attraction, the glass elevator. We inspected and scaled every level from the basement to the top height of the chimney and provided a topographical survey of the metal plates on the highest level. Our services on this project proved that the cost and time taken to install temporary scaffolding is no longer a viable option.

Leave a Reply